Clean Rivers Trust Trustees Meeting, 6th February 2012

Meeting held at 1 Derby Road, Nottingham.

Present at the meeting, Paul Southby, Peter Jones, Keith Gregson and Harvey Wood.

Apologies were received from Rusty Lewthwaite, Jes Healy and Karen Hindle.

1/ The Annual Report and Accounts (circulated earlier) were accepted and will be lodged with the Charity Commission.

2/ every one is pleased with the web site and voted a thank you to Emily Keal for her work on the site and forbearance in dealing with the flow of additions to it.

3/ the ongoing development of the Trust was discussed;

a/ Thames Water and the Tide Way Tunnel to avoid the continuation of the Pollution of the tidal river via storm water overflows was considered vital and ongoing involvement will continue. (www.thamestunnelconsultation.co.uk ) ( www.thamewater.co.uk )

b/ The issues of the Fourth London Airport are to be actively engaged with, as is already the case.

c/ Sustainable Urban Drainage (SUDS) is to receive more active involvement by the Trust

d/  An overview of various options to be published on alternative heat/energy sources such as ground water and abandoned mines through to nuclear options to be reported on.

e/ Continued involvement with regard to water and shale gas deposit exploitation (including fracking, a pair of papers on the web site); similarly the development of coal/methane based generation activities.

f/ Place more links on the web site to allied bodies such as BGS www.bgs.ac.uk , also the Charles Close Society www.charlesclosesociety.org and their map archive www.lib.cam.ac.uk.deptserv/maps/index.html

4/ The library needs cataloguing and a proper insurance sorted out. Further there needs to be development in linking the facility more closely to academic institutions.

5/ The new links to develop Ethiopian sewer project funding and other projects are to explored further.  Develop an understanding of the transparency of accounting (by MEPs) for the 32 million Euros given for sewage development by the EU in 2002.

6/ The feasibility of an arts based, Trent themed, event in two years time is to continue.

7/ A re-involvement with Nottingham University is to be explored as will the development of new relations with other academic institutions. There is a need to link with Aberystwyth and gain from their expertise in librarianship.

8/ The Trust will develop its links with other groups so as to advertise its expertise, services and facilities.

9/ PJ is to share information regarding the Office of Fair Trading regarding released space in sewer facilities.

The next meeting will be 2nd July at 10.00 at 1 Derby Road, Nottingham.

Harvey Wood.

6th February 2012.

Recommended Articles

Verified by MonsterInsights